Skip to content Skip to main navigation Skip to footer

Month: July 2024

Transportation Department July 18 2024 Letter to Carson Crossing residents

County Transportation Department Director Martinez shares letter concerning Carson Crossing Drive area issues with EDH APAC.

El Dorado County Director of Transportation Rafael Martinez provided EDH APAC a copy of a letter to El Dorado Hills residents addressing concerns about traffic and development issues near Carson Crossing Drive.

In his letter Director Martinez identified six areas that the Transportation Department is exploring, based on concerns expressed by El Dorado Hills residents.

  1. Analyzing Speed Surveys, Setting Speed Limits, and Stop Signs
  2. Enhanced Signage and Road Markings
  3. Pedestrian Crosswalks and Signals
  4. Traffic Enforcement
  5. Community Engagement and Education
  6. Implementation of Roundabouts

Director Martinez addresses the difficulty of restricting truck traffic on Carson Crossing Drive due to ongoing construction projects in the area (both in the adjacent El Dorado Hills Business Park, and the ongoing construction of the residential Lennar Heritage developments).

EDH APAC appreciates the ongoing dialog of the Transportation Department with El Dorado Hills residents. Since El Dorado Hills is the largest community in the County, and is the source of the majority of new development, residents frequently forget that the Transportation Department has obligations that extend to all areas of the County, and many of those other County Communities lack development funding to provide road capacity improvements, and like El Dorado Hills, the funding required for ongoing road maintenance. EDH APAC welcomes community participations as we address transportation and circulation issues in our Communities.

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download July 18 2024 DOTLetter [2.42 MB]


EDH APAC Transportation Documents Page

Town & Country Village El Dorado DEIR Available

45 day public review period to end on September 9, 2024

The El Dorado Count Planning and Building Department released the Notice of Availability for the Town and Country Village El Dorado DRAFT environmental impact report on July 26, 2024. A 45 day public review period has been established to accept public comments, questions, and concerns, regarding the ENVIRONMENTAL impacts of the project. Public review comments can be submitted via email to TownAndCountryElDorado@edcgov.us.

This DEIR identifies that the proposed project could result in significant environmental impacts to the following CEQA topics: Aesthetics; Air Quality, Greenhouse Gas Emissions, and Energy; Biological Resources; Cultural Resources; Geology and Soils; Hazards and Hazardous Materials; Hydrology and Water Quality; Noise; Transportation; Tribal Cultural Resources; and Wildfire.

In the Notice of Availability, the County also details that they will conduct a meeting to receive comments regarding the content of the DEIR and answer general questions regarding the environmental process. The meeting will be held in-person with a remote option via Zoom on Thursday, August 22, 2024, from 5:30pm to 7:30pm at the El Dorado County Planning and Building Department, 2850 Fairlane Ct, Building C, Placerville, CA 95667 in the Planning Commission hearing room. The Zoom meeting link is accessible at the following: https://us06web.zoom.us/j/88543474078 – This is NOT a Planning Commission Hearing, but a presentation for the public facilitated by El Dorado County.

The project site is located in El Dorado County, California, approximately 500 feet north of U.S. Highway 50, east of Bass Lake Road. The approximately 60.5-acre site is identified by Assessor’s Parcel Numbers (APN) 119-080-12, -021 and -023. The project site is located in the southern central portion of the Bass Lake Hills Specific Plan (BLHSP); the northern portion of the project site is located within the Community Region of the El Dorado County General Plan, and the southern portion of the site is located within the Rural Region.

The project site includes two areas: the Project Development Area and the Program Study Area. The Project Development Area consists of the northernmost and southernmost 30.3 acres of the project site, and would be developed with two hotels, retail services, two restaurants, a museum, an event center, associated parking, 56 residential cottages for employee housing, and an additional 56 residential cottages that may be rented on a daily or extended stay basis. The Program Study Area consists of the central and easternmost 30.2 acres of the project site, and may include future development of additional hotels, medical facilities, senior housing, townhomes and cottages, and other uses allowed by the proposed zoning districts. Development within the Program Study Area of the project site is not currently proposed; however, a maximum buildout scenario is included for program level analysis in the EIR. Vehicle access to the project site would be provided by private roads connecting to Bass Lake Road to the west and to Country Club Drive to the north. In addition to on-site utility improvements, full buildout of the proposed project would require installation of off-site water, sewer, and natural gas utilities within Bass Lake Road, other nearby roads, and with respect to the sewer line, generally to the west along Old Bass Lake Road/Lincoln Highway towards Carson Creek.

The proposed project would require approval of:
A General Plan Amendment
BLHSP Amendment
BLHSP Public Facilities Financing Plan Amendment
Rezone
Planned Development
Tentative Subdivision Map
Conditional Use Permit (CUP)
Other responsible agency approvals (e.g., El Dorado LAFCO related to annexation of the project site into EID’s service area).


Project documents available on EDH APAC Project Documents Page

_noa.pdf” download=”all” text=”Download Notice of Availability”]


Applicant presentation scheduled for September 4, 2024 EDH APAC Meeting

EDH APAC Comments on Third and Fourth Quarter 2024 Project Review Schedule

Letter submitted July 3rd.

The Officers of the El Dorado Hills Area Planning Advisory Committee (EDH APAC) submitted a letter expressing concerns about the tentative review schedule of multiple projects impacting El Dorado Hills in the third and fourth quarters of 2024.

Adequate time for thoughtful project review and analysis along with input from residents results in projects that offer increased benefits for a community to better balance against potential negative impacts.

The El Dorado County Planning and Building Department must operate in a manner that adheres to both state law, as well as El Dorado County policies and ordinances, in a process that respects the rights of project applicants, and County residents. EDH APAC recognizes that Planning and Building Staff have a challenging task to respond to both developers and the community. EDH APAC is grateful for the collaborative manner that County Staff conducts project review, and the amount of assistance that Staff generously provides to EDH APAC volunteers, and the community.

Please note that the letter contains a typo regarding the date of the Town & Country Village El Dorado Scoping meeting date – the letter indicates August 2024, when in fact the Scoping meeting was held in August 2023.

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download EDH APAC Comment Letter [168.88 KB]