Creekside Village Specific Plan DRAFT EIR Published June 20, 2025

DRAFT Environmental Impact Report – JUNE 2025

From the June 20, 2025 Notice of Availability:

DOCUMENT AVAILABILITY AND REVIEW PERIOD: This DEIR is available for public and agency review for a 60-day period beginning June 20, 2025, and ending August 19, 2025. The purpose of this comment period is to consider the content of the DEIR and the potential environmental impacts that may result from project implementation. Comments pertaining to the environmental impact analysis, criteria and thresholds, mitigation measures and alternatives presented in the DEIR will be considered by the County during preparation of the Final EIR. The Final EIR will include copies of the comments received during the comment period and the County’s responses to comments pertaining to the environmental review and DEIR. A subsequent scheduled public hearing will be conducted on the project upon completion of the Final EIR when the County considers action on the project. The County must certify the Final EIR prior to project approval. If you wish to be notified of that hearing date, please provide your name and mailing address to the Planning and Building Department.

REDUCED IMPACT ALTERNATIVE:
Preparation of an EIR requires the lead agency, in this case the County, to consult with local Native American Tribes (Tribes) that are traditionally and culturally affiliated with the project area regarding the presence of tribal cultural resources (TCRs). Through the consultation process with local Tribes, it was revealed that TCRs exist within the site and would be impacted by the project and could not be avoided. In addition, the Latrobe School District indicated during preparation of the DEIR that its existing schools could not absorb the increase in students generated by the project and requested a reduction in the number of conventional housing units. To address potential significant impacts, an EIR is required to evaluate an alternative that would avoid or lessen environmental impacts while still meeting most of the objectives of the project. In collaboration with the Tribes and Latrobe School District, a new land use plan, the Reduced Impact Alternative (RIA), was developed which avoids impacts to TCRs and reduces the total number of residential units from 918 to 763, including limiting the number of conventional housing units to a maximum of 150 with the remainder restricted to Active Adult. The RIA proposes a 7.5-acre Village Park with 1.6 acres of the park containing a Planned Development (PD) overlay designation that could allow for neighborhood commercial uses to serve the plan area, similar to the proposed project. These potential commercial uses would require approval of a separate Conditional Use Permit and Planned Development. There would be two additional Neighborhood Parks, 4.4 and 2.2 acres in size, for a total of 14.1 acres in parks and 44.4 acres in open space. Given the ability to address significant impacts to TCRs and the concerns of the Latrobe School District, it was decided that the RIA should be analyzed at a project-specific level so that the County could ultimately approve the RIA instead of the proposed project.

This DEIR therefore evaluates the land use plan that was originally submitted by the applicant as the proposed project and also analyzes the RIA at the project-specific level, either of which could be approved by the County. Based on analysis completed at this time, County staff intends to recommend the RIA for approval because it avoids impacts to TCRs, reduces additional environmental impacts, and is the land use plan preferred by both the Tribes and the Latrobe School District.


June 2025 Creekside Village Specific Plan Draft Environment Impact Report Documents

The Draft Environmental Impact Report is available in ten sections – beginning with section 0.1 Creekside Village SP Cover Page, through section 6.0 Creekside Village SP DEIR Preparers. The applicant then provides all ten sections in one document, the Combined DEIR Creekside Village Specific Plan. This is further supported by ten appendices beginning with appendix A – Creekside Village SP DEIR Appendix A – NOP and Combined Comments, and concluding withe appendix J – Creekside Village SP DEIR Appendix J – Fire Safe Plan.

The DRAFT EIR documents are available on the El Dorado County Planning Department EIR page for the Creekside Village SP project.

The DRAFT EIR Documents, links, and other project documents can also be found on the EDH APAC Creekside Village project Documents page

Town & Country Village El Dorado DEIR Available

45 day public review period to end on September 9, 2024

The El Dorado Count Planning and Building Department released the Notice of Availability for the Town and Country Village El Dorado DRAFT environmental impact report on July 26, 2024. A 45 day public review period has been established to accept public comments, questions, and concerns, regarding the ENVIRONMENTAL impacts of the project. Public review comments can be submitted via email to TownAndCountryElDorado@edcgov.us.

This DEIR identifies that the proposed project could result in significant environmental impacts to the following CEQA topics: Aesthetics; Air Quality, Greenhouse Gas Emissions, and Energy; Biological Resources; Cultural Resources; Geology and Soils; Hazards and Hazardous Materials; Hydrology and Water Quality; Noise; Transportation; Tribal Cultural Resources; and Wildfire.

In the Notice of Availability, the County also details that they will conduct a meeting to receive comments regarding the content of the DEIR and answer general questions regarding the environmental process. The meeting will be held in-person with a remote option via Zoom on Thursday, August 22, 2024, from 5:30pm to 7:30pm at the El Dorado County Planning and Building Department, 2850 Fairlane Ct, Building C, Placerville, CA 95667 in the Planning Commission hearing room. The Zoom meeting link is accessible at the following: https://us06web.zoom.us/j/88543474078 – This is NOT a Planning Commission Hearing, but a presentation for the public facilitated by El Dorado County.

The project site is located in El Dorado County, California, approximately 500 feet north of U.S. Highway 50, east of Bass Lake Road. The approximately 60.5-acre site is identified by Assessor’s Parcel Numbers (APN) 119-080-12, -021 and -023. The project site is located in the southern central portion of the Bass Lake Hills Specific Plan (BLHSP); the northern portion of the project site is located within the Community Region of the El Dorado County General Plan, and the southern portion of the site is located within the Rural Region.

The project site includes two areas: the Project Development Area and the Program Study Area. The Project Development Area consists of the northernmost and southernmost 30.3 acres of the project site, and would be developed with two hotels, retail services, two restaurants, a museum, an event center, associated parking, 56 residential cottages for employee housing, and an additional 56 residential cottages that may be rented on a daily or extended stay basis. The Program Study Area consists of the central and easternmost 30.2 acres of the project site, and may include future development of additional hotels, medical facilities, senior housing, townhomes and cottages, and other uses allowed by the proposed zoning districts. Development within the Program Study Area of the project site is not currently proposed; however, a maximum buildout scenario is included for program level analysis in the EIR. Vehicle access to the project site would be provided by private roads connecting to Bass Lake Road to the west and to Country Club Drive to the north. In addition to on-site utility improvements, full buildout of the proposed project would require installation of off-site water, sewer, and natural gas utilities within Bass Lake Road, other nearby roads, and with respect to the sewer line, generally to the west along Old Bass Lake Road/Lincoln Highway towards Carson Creek.

The proposed project would require approval of:
A General Plan Amendment
BLHSP Amendment
BLHSP Public Facilities Financing Plan Amendment
Rezone
Planned Development
Tentative Subdivision Map
Conditional Use Permit (CUP)
Other responsible agency approvals (e.g., El Dorado LAFCO related to annexation of the project site into EID’s service area).


Project documents available on EDH APAC Project Documents Page

_noa.pdf” download=”all” text=”Download Notice of Availability”]


Applicant presentation scheduled for September 4, 2024 EDH APAC Meeting

Notice Of Availability DEIR Montano de El Dorado Phase 2

The County of El Dorado Planning and Building Department, Planning Division, as the Lead Agency, has prepared a Draft Environmental Impact Report (DEIR) for the proposed Montano De El Dorado Phase I and II Master Plan Project.

The Project is comprised of a rezone of a 16.85 property form REGIONAL COMMERCIAL- DESIGN CONTROL (CR-DC) to REGIONAL COMMERCIAL- PLANNED DEVELOPMENT (CR-PD) as part of the Montano de El Dorado Development Plan. The project is located on the east side of Latrobe Road, 500 feet south of the intersection with White Rock Road.

From the County’s Notice Of Availability announcement:

DOCUMENT AVAILABILITY AND REVIEW PERIOD: This DEIR is available for public and agency review for a 45-day period beginning Saturday, May 30, 2020 and ending Monday, July 13, 2020. The purpose of this comment period is to consider the content of the DEIR and the potential environmental impacts that may result from project implementation, not the positive or negative attributes of the Project itself. Comments pertaining to the impact analysis, criteria and thresholds, mitigation measures, and alternatives presented in the DEIR will be considered by the County during preparation of the Final EIR (FEIR).

All written public and agency comments on the DEIR must be received by 5:00 PM on Monday, July 13, 2020 and should be directed to: El Dorado County Planning and Building Department, Planning Division, Attention: Tom Purciel, 2850 Fairlane Court, Placerville, CA 95667. Include the name of the contact person of your agency, if applicable.

Comments may be submitted via email to montano@edcgov.us. Comments submitted via email must either be included in the body text of the message or as an attachment in Microsoft® Word or Adobe® PDF format. Comments may also be submitted via fax to (530) 642-0508.

PUBLIC WORKSHOP: The DEIR is scheduled for a public workshop before the Planning Commission on June 25, 2020. The purpose of this workshop is to present information on the DEIR and receive public input; no action will be taken. To subscribe to Planning Commission agendas and minutes visit: https://www.edcgov.us/Government/planning/Pages/planning_commission.aspx and register your email address with the County’s free email subscription service. When registering, please select “Planning Commission agenda” from the list of topics provided. Planning Commission agendas are posted online no less than 72 hours prior to the meeting at: https:\eldorado.legistar.com/Calendar.aspx.

El Dorado County Notice of Availability: DEIR Montano de El Dorado Phase 2

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Notice Of Availability [2.40 MB]

Proposed Entitlement Requests:

  • A Rezone (Z15-0002) of the 16.85-acre Phase II property from Regional Commercial- Design Control (CR-DC) to Regional Commercial- Planned Development;
  • A Commercial Tentative Parcel Map (P15-0006) on the 16.85-acre Phase II parcel creating a total of 12 commercial lots, ranging from 0.72 acres to 3.48 acres in size, as part of the proposed Montano De El Dorado Phase 2 Development Plan; and
  • A Planned Development Permit (PD15-0004) for the existing Montano De El Dorado Phase 1 Development and the proposed Phase II expansion. The proposed Phase 2 of the development would include approximately 74,000 square feet of retail/commercial space within eight buildings, 6,000 square feet of office space, 63,000 square feet, 99-room hotel, and an amphitheater.
  • Modifications to an existing Conditional Use Permit (S17-0015) for Phase I to allow outdoor special events and office uses within existing Phase 1 and the proposed Phase II.

EDH APAC Montano de El Dorado Phase 2 Documents Page