Skip to content Skip to main navigation Skip to footer

Gateway El Dorado Specific Plan

TRAKiT link PA24-0009 – Requires FREE TRAKiT user account

Project Description from Pre-App

Gateway El Dorado – Proposed specific plan to amend the current R&D land use and zoning on approximately 66.9 acres of the 97.74 acre site to include commercial, multifamily residential, park, and open space uses. The remaining 30.4 acres would be retained in their current R&D land use and zoning.

Description:

Gateway El Dorado Specific Plan Pre-App

Type:

PRE APPLICATION

Subtype:

Planner:

EVAN MATTES

Status:

PROCESSING

Applied:

7/31/2024

Attachments:
Application Packet_PA24-0009.pdf Application Packet_PA24-0009.pdf
Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Application Packet [5.65 MB]

Notice of Public Scoping Meeting and Preparation of a Draft Environmental Impact Report Thursday January 29, 2026 6PM

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download NOTICE [1.07 MB]

Project #PROJ25-0007

Description:

Gateway El Dorado

Type:

PROJECT

Subtype:

Planner:

BIANCA DINKLER

Status:

PROCESSING

Applied:

5/13/2025

Approved:

Closed:

Expired:

Complete:

Incomplete:

Linked Activities:Project(s)

SP25-0001  SPECIFIC PLAN  PROCESSING

SP25-0001

Description:

Gateway El Dorado

Type:

SPECIFIC PLAN

Subtype:

Planner:

BIANCA DINKLER

Status:

PROCESSING

Applied:

5/9/2025

Approved:

Closed:

Expired:

Complete:

Incomplete:

Linked Activities:Parent Project

PROJ25-0007  PROJECT  PROCESSING

Project(s)

Z25-0004  ZONE CHANGE  PROCESSING
GPA25-0001  GENERAL PLAN AMENDMENT  PROCESSING
Attachments:
APN-11721.pdf APN-11721.pdf
Application Packet_SP25-0001, GPA25-0001, Z25-0004.pdf Application Packet_SP25-0001, GPA25-0001, Z25-0004.pdf

Z25-0004

Description:

Gateway El Dorado

Type:

ZONE CHANGE

Subtype:

GENERAL

Planner:

BIANCA DINKLER

Status:

PROCESSING

Applied:

5/9/2025

GPA25-0001

Description:

Gateway El Dorado

Type:

GENERAL PLAN AMENDMENT

Subtype:

GENERAL

Planner:

BIANCA DINKLER

Status:

PROCESSING

Applied:

5/9/2025

Application Packet May 13, 2025

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Application Packet [5.65 MB]

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download APN MAP [5.65 MB]

Draft Specific Plan from EDC Project In Your Area Website

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download DRAFT Specific Plan [3.54 MB]

Attachments