EDH 52 Costco CUP-R21-0024 Z17-0004 P17-0007 S17-0017 PD15-0001

JULY 12, 2023 – REVISED PROJECT APPLICATION PACKET

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Application Packet [1.74 MB]


July 12, 2023 Revised Preliminary Ultimate Site Plan (North)

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Revised Site Plan [1.15 MB]


July 12, 2023 Revised Preliminary Interim Site Plan (North)

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Preliminary Site Plan Interim [1.12 MB]


July 10, 2023 Project Notification Letter to Agencies (TAC Meeting July 31, 2023)

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Project Notification Letter [194.88 KB]


Project #20278


Description:

PD15-0001/EDH 52 (Z17-0004,P17-0007,CUP-R21-0024,LLA21-0009)

Type:

DEVELOPMENT PLAN

Subtype:

Planner:

ANNA LEANZA

Status:

PROCESSING

Applied:

1/5/2015

Approved:

Closed:

Expired:

Complete:

8/4/2021

Incomplete:

Linked Activities:Parent Project

PROJ21-0003  PROJECT  PROCESSING

Project(s)

LLA21-0009  LOT LINE ADJUSTMENT  PROCESSING
2 SP2 – PRELIMINARY SITE PLAN ULTIMATE.pdf 2 SP2 – PRELIMINARY SITE PLAN ULTIMATE.pdf
1 SP1 – PRELIMINARY SITE PLAN INTERIM.pdf 1 SP1 – PRELIMINARY SITE PLAN INTERIM.pdf
REVISED Application Package_Submitted 06262023 Application Packet 06-26-2023_PD15.pdf
03-25-2022 Application Packet_V22-0001.pdf
09-03-2021 Initial Consultation Letter_PD15-0001,Z17-0004,P17-0007,CUP-R21-0024,LLA21-0009.pdf
NOP-Correction_Public Scoping Meeting_EDH 52 Commercial Center EDH 52 Commercial Center NOP-Correction.pdf
08/23/2021 NOP_DEIR_Public Scoping Meeting_EDH 52 Commercial Center.pdf
Completeness Letter_EDH 52 Commercial Center 08-04-2021.pdf Completeness Letter_EDH 52 Commercial Center 08-04-2021.pdf
Tree Removal Exhibit_South Site Costco 06-23-2021.pdf Tree Removal Exhibit_South Site Costco 06-23-2021.pdf
Oak Tree Report_Helix 07-06-2021.pdf Oak Tree Report_Helix 07-06-2021.pdf
Draft Drainage Study_Watermark Engineering 06-15-2021.pdf Draft Drainage Study_Watermark Engineering 06-15-2021.pdf
EDH 52_North_ Costco South_OverallSitePlan 04-22-2021.pdf EDH 52_North_ Costco South_OverallSitePlan 04-22-2021.pdf
Project Description Update 6-24-2021.pdf Project Description Update 6-24-2021.pdf
PD15-0001 Signed Application Sheet.pdf PD15-0001 Signed Application Sheet.pdf
Slope Exhibit.pdf Slope Exhibit.pdf
11 – Tentative Parcel Map.pdf 11 – Tentative Parcel Map.pdf
EDH 52-Costco Incomplete Letter 05-23-2021.pdf EDH 52-Costco Incomplete Letter 05-23-2021.pdf
2021-04-28 County Resubmittal_Costco.pdf 2021-04-28 County Resubmittal_Costco.pdf
North Site EDH Retail Plan Set.pdf North Site EDH Retail Plan Set.pdf
North Site Self-Storage Elevations (combo).pdf North Site Self-Storage Elevations (combo).pdf
Oak Resources Technical Report Dated November 2020.pdf Oak Resources Technical Report Dated November 2020.pdf
Biological Assessment Dated October 2017.pdf Biological Assessment Dated October 2017.pdf
Aquatic Resources Assessment Dated November 2020.pdf Aquatic Resources Assessment Dated November 2020.pdf

Project #21424

Description:

Z17-0004 EDH 52 Commercial Center (See PD15-0001)

Type:

ZONE CHANGE

Subtype:

Planner:

GINA HAMILTON

Status:

PROCESSING

Applied:

10/10/2017

Approved:

Closed:

Expired:

Complete:

8/4/2021

Incomplete:

Attachments:
09-03-2021 Initial Consultation Letter_PD15-0001,Z17-0004,P17-0007,CUP-R21-0024,LLA21-0009.pdf
NOP-Correction_Public Scoping Meeting_EDH 52 Commercial Center EDH 52 Commercial Center NOP-Correction.pdf
08/23/2021 NOP_DEIR_Public Scoping Meeting_EDH 52 Commercial Center.pdf
Completeness Letter_EDH 52 Commercial Center 08-04-2021.pdf Completeness Letter_EDH 52 Commercial Center 08-04-2021.pdf
Environmental Questionaire.pdf Environmental Questionaire.pdf
12 – Rezone Exhibit.pdf 12 – Rezone Exhibit.pdf
Slope Exhibit.pdf Slope Exhibit.pdf
Project Area Vicinity Map.pdf Project Area Vicinity Map.pdf
EDH 52_North_South_OverallSitePlan.pdf EDH 52_North_South_OverallSitePlan.pdf

Project #CUP-R21-0024

Description:

EDH 52 Commercial Center (See PD15-0001)

Type:

CONDITIONAL USE PERMIT-REVISION

Subtype:

Planner:

GINA HAMILTON

Status:

PROCESSING

Applied:

5/7/2021

Approved:

Closed:

Expired:

Complete:

8/4/2021

Incomplete:

Attachments:
09-03-2021 Initial Consultation Letter_PD15-0001,Z17-0004,P17-0007,CUP-R21-0024,LLA21-0009.pdf
NOP-Correction_Public Scoping Meeting_EDH 52 Commercial Center EDH 52 Commercial Center NOP-Correction.pdf
08/23/2021 NOP_DEIR_Public Scoping Meeting_EDH 52 Commercial Center.pdf
Completeness Letter_EDH 52 Commercial Center 08-04-2021.pdf Completeness Letter_EDH 52 Commercial Center 08-04-2021.pdf
CUP-R21-0024 Signed Application Sheet.pdf CUP-R21-0024 Signed Application Sheet.pdf
Self-Storage Elevation P2.pdf Self-Storage Elevation P2.pdf
Self-Storage Elevation P1.pdf Self-Storage Elevation P1.pdf
Self-Storage Color Elevation.pdf Self-Storage Color Elevation.pdf
North Site Self-Storage Elevations (combo).pdf North Site Self-Storage Elevations (combo).pdf

LLA21-0009

Description:

EDH 52 Commercial Center (See PD15-0001)

Type:

LOT LINE ADJUSTMENT

Subtype:

Planner:

GINA HAMILTON

Status:

PROCESSING

Applied:

5/7/2021

Approved:

Closed:

Expired:

Complete:

8/4/2021

Incomplete:

Attachments:
03-25-2022 Application Packet_V22-0001.pdf
09-03-2021 Initial Consultation Letter_PD15-0001,Z17-0004,P17-0007,CUP-R21-0024,LLA21-0009.pdf
NOP-Correction_Public Scoping Meeting_EDH 52 Commercial Center EDH 52 Commercial Center NOP-Correction.pdf
08/23/2021 NOP_DEIR_Public Scoping Meeting_EDH 52 Commercial Center.pdf
Completeness Letter_EDH 52 Commercial Center 08-04-2021.pdf Completeness Letter_EDH 52 Commercial Center 08-04-2021.pdf
Slope Exhibit.pdf Slope Exhibit.pdf
Project Area Vicinity Map.pdf Project Area Vicinity Map.pdf
LLA-SITE PLAN.pdf LLA-SITE PLAN.pdf
LLA Legal Description.pdf LLA Legal Description.pdf
Environmental Questionaire.pdf Environmental Questionaire.pdf

Application Packet

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Application Packet [6.19 MB]

EDH 52 North and South Overall Site Plan

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Overall Site Plan [3.96 MB]

2021-04-28 County Resubmittal Costco

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Overall Site Plan [15.92 MB]

The full 29MB non-reduced PDF File is HERE

El Dorado County Planning Department announces Notice of Preparation of Draft Environmental Impact Report and September 8, 2021 Scoping Meeting (VIRTUAL)

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download NOP [1.69 MB]

CORRECTED Notice of Public Scoping Meeting

EDH APAC Letter Regarding Public Scoping Meeting


UPDATED: Project Notification Letter to affected Agencies: TAC meeting July 31, 2023

A Planned Development Permit, Rezone, Tentative Parcel Map, Lot Line Adjustment and Variance to develop two sites; the southerly site is approximately 17 acres where 156,000 square feet of commercial uses are proposed, the northerly site is approximately 18 acres where a mixed-use development is proposed. The mixed-use development will include 14,000 square feet of neighborhood commercial uses, as well as 304 multifamily units within five four-story buildings, amenities include a pool area, gym and outdoor gathering space, with associated site improvements. The properties, identified by Assessor’s Parcel Numbers 122-720-002, 122-720-003, 122-720-018, 122-720-019, 122-720-020 and 122-720-021, consist of 40.56 acres, and are located directly north of US Highway 50 at the Silva Valley Parkway exit, in the El Dorado Hills area, Supervisorial District 1.

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Project Notification Letter [194.88 KB]


July 24, 2023 EDH APAC TAC Email

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download EDH APAC Comment Email [81.08 KB]

July 31, 2023 TAC Meeting EDH APAC Comment Letter

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download EDH APAC Comment Letter [165.84 KB]

Attachments