Skip to content Skip to main navigation Skip to footer

PD-R19-0001 PA18-0007 Superior Self Storage Conversion

Superior Self-storage conversion project – conversion of the old VPD facility located at 4250 Town Center Blvd at Latrobe Rd. APN 117-160-64-100

Project #PD-R19-0001

Description:Revision of PD95-0007
Type:DEVELOPMENT PLAN-REVISION
Subtype:
Planner:EVAN MATTES
Status:COMPLETE
Applied:2/13/2019
Approved:
Closed:
Expired:
Complete:3/27/2019
Incomplete:3/14/2019
Attachments:
02/22/2019 Application Packet_PD-R19-0001.pdf
Letter – Incomplete (031419).pdf Letter – Incomplete (031419).pdf
03/29/2019 Initial Consultation Letter_PD-R19-0001.pdf
Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Application Packet [4.95 MB]


PA18-0007 – Superior Self Storage (Superior Storage Group, Dave Kindelt). A request for pre-application for a self-storage facility in three development phases: 1) Conversion of an existing 89,470± square foot building (formerly Atlanta Precision Molding) to self-storage; 2) Construction of a new 22,800± square foot building abutting the existing building; and 3) Construction of an additional 64,878± square foot building. The property is identified as Assessor’s Parcel Number 117-160-64, consists of 14.8 acres, and is located at 4250 Town Center Boulevard, on the northwest corner of the intersection of Latrobe Road and White Rock Road, in the El Dorado Hills area.

Project #PA18-0007

    Description:PA18-0007 Superior Self Storage Conversion
    Type:PRE APPLICATION
    Subtype:
    Planner:ALEX GUILBERT
    Status:PROCESSING
    Applied:9/14/2018
    Approved:
    Closed:
    Expired:
    Complete:
    Incomplete:
    Attachments:
    09/17/2018 Application Packet_PA18-0007.pdf
    09/27/2018 (Phase II-1) SSS El Dorado Hills – Site Plan.pdf
    09/27/2018 (Phase II-2) SSS El Dorado Hills – Floor Plans and UM.pdf
    09/27/2018 (Phase II-3) SSS El Dorado Hills – Elevations.pdf
    09/27/2018 (Phase II-4) SSS El Dorado Hills – Landscape Plan.pdf
    09/27/2018 (Phase II-A2) SSS El Dorado Hills – Color Site Plan.pdf
    09/27/2018 (Phase II-B1) SSS El Dorado Hills – Color Site Plan.pdf
    09/27/2018 (Phase II-B2) SSS El Dorado Hills – Color Elevations.pdf
    09/27/2018 (Phase III-1) SSS El Dorado Hills – Site Plan.pdf
    09/27/2018 Project Narrative.pdf
    9/28/2018.pdf PA18-0007 Consultation Request Letter.pdf
    Exhibit I EDC DOT.pdf Exhibit I EDC DOT.pdf
    Exhibit J EDC Environmental Management.pdf Exhibit J EDC Environmental Management.pdf
    Exhibit K EID.pdf Exhibit K EID.pdf
    Exhibit L EDH Fire Department.pdf Exhibit L EDH Fire Department.pdf
    PA18-0007 Worksheet.pdf PA18-0007 Worksheet.pdf
    TIS_ID_signed (1).pdf TIS_ID_signed (1).pdf

    NOTICE OF PUBLIC HEARING – September 12, 2019 Planning Commission:

    No Url Found

    PRE-APPLICATION AND CONCEPTUAL REVIEW

    Loader Loading...
    EAD Logo Taking too long?

    Reload Reload document
    | Open Open in new tab

    Download Application Packet [4.88 MB]

    Attachments