Skip to content Skip to main navigation Skip to footer

Montano De El Dorado Phase II

REZONE OF 16.85-ACRE PROPERTY FROM REGIONAL COMMERCIAL- DESIGN CONTROL (CR-DC) TO REGIONAL COMMERCIAL- PLANNED DEVELOPMENT (CR-PD) AS PART OF THE PROPOSED MONTANO DE EL DORADO DEVELOPMENT PLAN.

EAST SIDE OF LATROBE ROAD 500 FEET SOUTH OF THE INTERSECTION WITH WHITE ROCK ROAD.

1010 White Rock Road

Draft Environmental Impact Report:

DEIR Appendix A – C

Montano de El Dorado DEIR Appendix A-C: DUE TO LARGE FILE SIZE, OPEN IN A NEW TAB

DEIR Appendix D

Montano de El Dorado DEIR Appendix D: DUE TO LARGE FILE SIZE, OPEN IN A NEW TAB

DEIR on the El Dorado County Website:

eTRAKiT pages:

https://edc-trk.aspgov.com/etrakit/Search/project.aspx?activityNo=20500
https://edc-trk.aspgov.com/etrakit/Search/project.aspx?activityNo=20501
https://edc-trk.aspgov.com/etrakit/Search/project.aspx?activityNo=20502

Application Status Page (Broken Link to old County Project Status Page)

8/22/2017
Initial Consultation Letter_Z15-0002,PD15-0004,P15-0006, S17-0015
8/22/2017
EDC Conditional-Minor Use Permit 2017-08-16 (2)
7/12/2017
20170714_MontanoDeElDoradoPhase2NOP
7/12/2017
DRAFT-Montano phase 2 Project Description_Z15-0002,PD15-0004,P15-0006
7/12/2017
Vicinity Map_Montano De El Dorado Phase II Master Plan_ Z15-0002,PD15-0004,P15-0006
7/12/2017
Assessor’s Map_ Z15-0002,PD15-0004,P15-0006
7/12/2017
DRAFT- Aerial Photo_Montano De El Dorado Phase II Master Plan_ Z15-0002,PD15-0004,P15-0006
7/12/2017
Slope Map_Montano De El Dorado Phase II Master Plan_ Z15-0002,PD15-0004,P15-0006
7/12/2017
DRAFT-Conceptual Elevation Plans_Montano De El Dorado Phase II Master Plan_ Z15-0002,PD15-0004,P15-0006
7/12/2017
DRAFT-Preliminary Civil Plans_Montano De El Dorado Phase II Master Plan_ Z15-0002,PD15-0004,P15-0006
7/12/2017
DRAFT-TIS_102816_Montano De El Dorado Phase II Master Plan_ Z15-0002,PD15-0004,P15-0006
7/12/2017
Air Quality and Greenhouse Gas Analysis_Montano De El Dorado Phase II Master Plan_ Z15-0002,PD15-0004,P15-0006
7/12/2017
Preliminary Drainage Study_Montano De El Dorado Phase II Master Plan_ Z15-0002,PD15-0004,P15-0006
7/12/2017
Geotechnical Engineering Study Update_Montano De El Dorado Phase II Master Plan_ Z15-0002,PD15-0004,P15-0006
7/12/2017
Bio_Montano De El Dorado Phase II Master Plan_ Z15-0002,PD15-0004,P15-0006
7/30/2015
Application Packet

Notice of Availability and Notice of Public Workshop-Draft Environmental Impact Report and Hearing Date 

May 29, 2020: DEIR Review Period Ends: July 13, 2020 / Public Workshop: June 25, 2020
Public Workshop will be held during the June 25, 2020 Planning Commission Meeting

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Notice Of Availability [2.40 MB]

20-0786    Version: 1
Type:Agenda ItemStatus:Agenda Item
File created:6/9/2020In control:Planning Commission
On agenda:6/25/2020Final action:
Title:NOTICED WORKSHOP: Planning and Building Department, Planning Division, providing a public workshop on the Montano De El Dorado Master Plan project (Rezone Z15-0002/Planned Development PD15-0004/Tentative Parcel Map P15-0006/Conditional Use Permit S17-0015) to present information on the Draft Environmental Impact Report which is undergoing a 45-day public review from May 30, 2020 to July 13, 2020 and to receive public input. No action by the Planning Commission will be taken. (Supervisorial District 2)
Attachments:1. A – Montano Draft EIR Notice of Availability and Public Workshop PC 06-25-20, 2. B – Proof of Publication – Mountain Democrat PC 06-25-20, 3. C – Proof of Publication – Sacramento Bee PC 06-25-20, 4. D – Notification Map (1 mile radius) PC 06-25-20, 5. E – Staff’s Powerpoint Presentation PC 06-25-20

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Staff's PowerPoint [3.44 MB]

Notice of Preparation of a Draft Environmental Impact Report and Notice of Public Scoping Meeting for the Montano De El Dorado Phase II Master Plan

OCTOBER 1, 2018: Re-Circulation of Notice of Preparation of a Draft Environmental Impact Report for the Montano De El Dorado Phase I and II Master Plan
This re-circulated Notice of Preparation (NOP) has been issued October 1, 2018 due to changes in the project since release of the  previous NOP in 2017 and to solicit comments from responsible and trustee agencies and other interested parties regarding the scope and content of the environmental information and analyses that should be included in the Draft EIR.

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download NOP of Recirculated DEIR [2.48 MB]


Description:Z15-0002 Montano De El Dorado Phase I and Phase II Master Pl
Type:ZONE CHANGE
Subtype:
Planner:ROMMEL PABALINAS
Status:PROCESSING
Applied:7/30/2015
Approved:
Closed:
Expired:
Complete:
Incomplete:
Attachments:
10/01/2018 20181001_MontanoPhase I and II_NOP_Re-Circulation.pdf

Attachments