Montano De El Dorado Phase II Master Plan

Notice of Preparation of a Draft Environmental Impact Report and Notice of Public
Scoping Meeting for the Montano De El Dorado Phase II Master Plan

The County will hold a public scoping meeting to provide additional information about the Project and to
receive verbal and written comments.
Date: Thursday, August 3, 2017
Time: 6:00 p.m. to 8:00 p.m.
Where: El Dorado Hills Fire Department Station 85
1050 Wilson Boulevard
El Dorado Hills, CA 95762
The scoping meeting format will be an open house; interested parties may arrive at any time during the
2-hour window to receive information on the Project or provide comments.

From the Notice of Preparation of the DEIR:

The project site is approximately 16.8 acres (731,808 square feet) of undeveloped nonnative grassland
and ranges in elevation from approximately 575 to 640 feet above sea level sloping gently south to
north.
Project Characteristics
1. Site Design
The project is Phase II expansion of an existing retail center (Phase I of the Montano de El Dorado
Master Plan) located north of the project site that would include additional retail space, an office
building, a boutique hotel, and a small amphitheater to host occasional events (see Exhibit 3).
The retail element of the project consists of development of eight buildings containing
approximately 74,000 square feet (sf) of retail space. These buildings would range in size from 3,200
sf to 30,000 sf with suite sizes ranging from 1,000 sf to a maximum of 30,000 square feet. As shown
in Exhibit 3, the retail buildings would be dispersed along the eastern and western boundaries of the
site with one of the retail buildings located near the center of the site. The retail buildings would be
between 24 and 50 feet in height, with some architectural elements reaching 70 feet.
County of El Dorado Montano De El Dorado Phase II Master Plan

An office building containing approximately 6,000 sf of office space would be in the southernmost
portion of the site with a maximum height of 43 feet.
An approximate 63,000 square foot hotel is proposed on the north-western portion of the project
site at Latrobe Road (south of the existing Pottery World Building). The hotel would include up to 99
guest rooms, two ground level conference rooms (approximately 1,000 square feet each), a lobby
area, and other typical amenities featured in boutique non-full-service hotels (e.g., a small sundry
sales area and minimal bar area). The hotel building would be diagonally positioned along the
western boundary of the project site. To compensate for hillside elevation variations, the hotel
would be trellised where the parking area on the north side of the building is at the second level of
the hotel and the west side of the building hosts the main entrance at the first level with the portecochere
facing the proposed main signalized entrance to the shopping center at Post Street and
Latrobe Road. The hotel would be four-stories and 47-feet in height, with some architectural
elements reaching 70 feet.
A small amphitheater is proposed near the center of the site to host occasional local events for the
El Dorado Hills community and others who are visiting the area. Typical events may include plays,
music, and local celebrations. The amphitheater would be constructed in a lowered grade
configuration to minimize and contain noise levels from travelling into nearby neighborhoods.
Specifically, the stage area would be located approximately 15 feet lower than the top of the
viewing area to the south, and approximately 20 feet lower than the grade level of a retail building
proposed just north (see Exhibit 3). Sound barrier walls would surround the stage at approximately
20 feet below grade on three sides and heavy landscaping would further dampen noise as well as
add ambiance. The seating area facing the stage would be a combination concrete/grass “step
down” area that gradually transitions to the lowered stage area.

Read the full Public notice here

EDH APAC Seeks Review Period Extension for El Dorado Hills Apartments DEIR

The El Dorado Hills Area Planning Advisory Committee requested a thirty day extension of the review period of the lengthy El Dorado Hills Apartments at Town Center Draft Environmental Impact Report ( File No. A16-0001, SP86-0002-R-3, Z16-0004, and PD94-0004-R-3 ), scheduled to be completed on August 14, 2017.

The El Dorado County Community Development Services Planning And Building Department has responded with a fifteen day extension period. The public review period will now end on August 30, 2017.

To implement the proposed development, the applicant is requesting an amendment to the El Dorado County General Plan (File No. A16-0001), an amendment to the existing El Dorado Hills Specific Plan (File No. SP86-0002-R3), a rezone of the project site (File No. Z16-0004), and a revision of the approved Town Center East Development Plan (File No. PD94-0004-R3.

The application status, and the DEIR can be viewed online here

 

 

El Dorado Hills Salmon Falls Area Plan

El Dorado Hills APAC Announces New Website

El Dorado Hills Area Planning Advisory Committee is proud to announce the volunteer organization’s new website – EDHAPAC.ORG.

APAC was formed in 1981 at the request of the County Board of Supervisors to provide public input for the development of the County’s new area plan for EDH and the Salmon Falls area.

Comprised entirely of volunteers in it’s thirty-six years of existence, EDH APAC has never had a formally recognized repository of planning history, documents, or data. In fact, other than a volunteer maintained mailing list, and now an email list, EDH APAC has never had the ability to keep El Dorado Hills residents informed in near real time of new projects, road improvements, new development proposals, specific plan changes, or  other zoning changes in the area, other than some generous coverage in local weekly newspapers The Village Life, El Dorado Hills Telegraph, three day a week publication The Mountain Democrat, and to a lesser extent, the Sacramento Bee.

Although many APACs were created in the same timeframe, the El Dorado Hills APAC has the unique distinction of being the only surviving and continuously operative APAC over the thirty six years since its inception. While the EDH APAC is only an advisory committee to the County, its recommendations have made a difference by influencing developers, County Planners, the Planning Commissioners, and the Board of Supervisors in the outcome of many proposed projects. APAC’s submittal of written position reports of support, conditional support or non-support represent the community’s strongest voice in local land use planning.

That is why we encourage all residents and business owners in EL Dorado Hills to participate, and lend their ideas and concerns to El Dorado Hills planning. We have but a single voting Supervisor representing our interests on the five member El Dorado County Board of Supervisors. We also only have a single voting Planning Commissioner on the five member El Dorado County Planning Commission. This has not always served the interests and concerns of El Dorado Hills residents well. Making EDH APAC a community resource, and including as much input from El Dorado Hills residents as possible, will provide us a stronger voice at the decision making levels in El Dorado County.

To that end – EDH APAC needs member participation. Any resident of El Dorado Hills is welcome to participate, and become an APAC member.  Read some more about EDH APAC membership in our EDH APAC Guidelines – these are from 2012, but we’re busy making updates, to make the concepts clearer, and to streamline the process of participation.

Through efforts of EDH APAC volunteers, we’re making an effort to evolve into a more involved organization, and we seek the input of all El Dorado Hills residents. Because EDH APAC receives no funding from El Dorado County, this website, as well as all APAC events and communications are the result of volunteers funding and donating their labor, efforts, and passions.

It will take considerable time to gather and digitize historical archived documents, and determine the appropriate county, and agency links. If you have any ideas, or  documentation to share, please email them to edhapac@gmail.com. Our first efforts will be to get current issues and project information onto the website. As we build this repository, we hope to get as much historical information uploaded as well.

Welcome to EDH APAC – we’re glad to see our neighbors here.

Springs Equestrian Center – Awaiting CDFW Botanical Survey

The California Department of Fish and Wildlife (CDFW) stating that a botanical survey meeting current protocols would be required for the project as the past surveys are older than five years and do not meet current protocol. In order to meet current CDFW survey protocols there must be three on-site surveys during the blooming season before a final report is produced. The biological consultant has stated that the final on-site survey would be completed July, 2017. After the final report is received by the County, the CEQA Initial Study/Mitigated Negative Declaration (IS/MND) must be revised to include the results. When this is complete a new hearing date will be scheduled for the project.

Review the Links the on Springs Equestrian Center Document Page

El Dorado Hills Apartments At Town Center 2017

From  EDC Planning Services
Z 16 0004  – EL DORADO HILLS APARTMENT TC

REZONE OF PROJECT SITE FROM GENERAL COMMERCIAL-PLANNED DEVELOPMENT (CG-PD) TO MULTIFAMILY RESIDENTIAL-PLANNED DEVELOPMENT (RM-PD) AND REVISIONS TO THE RM-ZONE DISTRICT DEVELOPMENT STANDARDS APPLICABLE TO THE PROPOSED 214-UNIT APARTMENT COMPLEX DEVELOPMENT PLAN

Project Location – NORTH SIDE OF TOWN CENTER DRIVE WEST OF THE INTERSECTION WITH VINE STREET IN THE EL DORADO HILLS TOWN CENTER.

 

4/18/2017
Revised Applications_A16-0001,Z16-0004,PD94-0004-R-3,SP86-0002-R-3

 

4/13/2016
Application Packet

 

A 16 0001  – EL DORADO HILLS APARTMENT TC

GENERAL PLAN AMENDMENT ADDING A NEW POLICY UNDER OBJECTIVE 2.2.6 (SITE SPECIFIC POLICY SECTION) INCREASING THE MAXIMUM RESIDENTIAL DENSITY ALLOWEDIN THE GENERAL PLAN FROM 24 DWELLING UNITS/ACRE TOA MAXIMUM OF 47 DWELLING UNITS/ACRE FOR THE 4.565-ACRE SITE WITHIN THE TOWN CENTER EAST PLANNED DEVELOPMENT AREA IDENTIFIED AS APNS 121-290-60, -61, AND -62

Click here for the Draft Environmental Impact Report