Skip to content Skip to main navigation Skip to footer

Silver Springs TM97-1330-E-2 Project TM-C18-0001

 

ProjectTM 97 1330 E – SILVER SPRINGS   
Project TypeSUBDIVISIONStatus:  [Definitions]PROCESSING
PlannerISAAC WOLF  District Supervisor:JOHN HIDAHL
Plan AreaRESCUE
Number of Lots234Vicinity Map:Not Available at this time
Project DescriptionSINCE ORIGINAL APPROVAL, SUBJECT PROJECT HAS WEATHERED TWO ECONOMIC RECESIONS, INCLUDING 2008. PROJECT HAS RECORDED LARGE LOT MAP AND SMALL LOT MAP FOR UNIT 1. PUBLIC IMPROVEMENTS HAVE BEEN MOSTLY COMPLETED IN THE FOUR EXTENSION PERIODS GRANTEDBY THE STATE. PROJECT APPLICANTS HAVE ENGAGED IN UPDATING PUBLIC IMPROVEMENTS NECESSARY IN UNITS 2 AND 3 OF THE FINAL MAP FOR COUNTY & EID. THEY ARE ALSO WORKING ON SILVER SPRINGS PARKWAY PROJECT. THE APPLICANTS ARE ONLY REQUESTING TWO 1-YEAR EXTENSIONS, AND ANTICIPATING FILING AN APPLICATIONFOR A FINAL MAP IN THE NEXT COUPLE OF MONTHS.
Project LocationS SIDE OF GREEN VALLEY ROAD APPROXIMATELY 1/2 MI FROM INTERSECTION OF BASS LAKE ROAD & GREEN VALLEYROAD
Situs0
APN(s)103-010-02-100   103-010-02-100   103-020-09-100   103-020-10-100   115-370-01-100   115-370-02-100   115-370-03-100   115-370-04-100   115-370-07-100   115-370-08-100   115-370-10-100   115-370-11-100

 

3/2/2018
Application Packet_TM97-1330-E-2
Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Application Packet TM97-1330-E-2 [2.79 MB]

NOTICE OF PUBLIC HEARING
The County of El Dorado Planning Commission will hold a public hearing in the Building C Hearing Room, 2850 Fairlane Court, Placerville, CA 95667 on June 28, 2018, at 8:30 a.m., to consider the following: Tentative Subdivision Map Time Extension TM97-1330-E-2/Silver Springs Subdivision submitted by SILVER SPRINGS, LLC

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download [95.97 KB]

Project #TM-C18-0001

Description:Silver Springs Unit 1 Map Amendment (TM97-1330)
Type:SUBDIVISION-AMENDMENT
Subtype:
Planner:
Status:SUBMITTED
Applied:9/17/2018
Approved:
Closed:
Expired:
Complete:9/17/2018
Incomplete:
Attachments:
09/18/2018 Application Packet_TM-C18-0001.pdf
10/10/2018 Initial Consultation Letter_TM-C18-0001.pdf
10/11/2018 REVISED Initial Consultation Letter_TM-C18-0001.pdf
19-0301 19-0208 SuplmntlRsponse-Ltr_Plans-BS-v1-MM.pdf 19-0301 19-0208 SuplmntlRsponse-Ltr_Plans-BS-v1-MM.pdf
03/06/2019 REVISED Initial Consultation Letter_TM-C18-0001_03-06-2019.pdf

NOTICE OF PUBLIC HEARING – June 4, 2019 2:00PM

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Notice of Public Hearing [130.91 KB]


Silver Springs Unit l Map Amendment – Combine lot 29 with 30, and lot 31 with 32; abandon Mena Court right-of-way
Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download [2.38 MB]

 

TAC MEETING OCTOBER 29 2018

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Initial Consultation [149.60 KB]

REVISED – TM-C18-0001 – SILVER SPRINGS UNIT 1 MAP AMENDMENT (TM97-1330)  initial consultation for review and comment

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download REVISED Initial Consulatation [149.87 KB]

Attachments