Skip to content Skip to main navigation Skip to footer

Carson Creek R&D Project P22-0009

Parcel Map

REGISTER FOR A FREE EL DORADO COUNTY ETRAKiT ACCOUNT TO VIEW PROJECT DOCUMENTS IN ETRAKiT –HERE

P22-0009

Tentative Parcel Map to divide four parcels totaling 64.22 acres into fourteen Research and Development (R&D)
parcels to be used for industrial wholesale distribution buildings and two open space and drainage parcels ranging
from 0.73 acres to 13.07 acres in size. The properties, identified by Assessor’s Parcel Numbers 117-210-048, 117-
210-049, 117-210-050 and 117-210-060, consist of 64.22 acres, and are located on the east side of Latrobe Road,
approximately 580 feet north of the intersection with Golden Foothill Parkway, in the El Dorado Hills area,
Supervisorial District 2.

Description:

Carson Creek R&D Proj. Comm Parcel Map creating 16 lots

Type:

PARCEL MAP

Planner:

TIMOTHY PITT

Status:

PROCESSING

Applied:

11/1/2022

Complete:

4/3/2023

Incomplete:

Attachments:
P22-0009 Initial Consultation Letter.pdf P22-0009 Initial Consultation Letter.pdf
P22-0009_TIS-ID Signed.pdf P22-0009_TIS-ID Signed.pdf
P22-0009 Trip Generation Estimates.pdf P22-0009 Trip Generation Estimates.pdf
P22-0009 Environmental Questionnaire.pdf P22-0009 Environmental Questionnaire.pdf
P22-0009 EID FIL.pdf P22-0009 EID FIL.pdf
P22-0009 AQMD Waiver.pdf P22-0009 AQMD Waiver.pdf
Large Maps_P22-0009.pdf Large Maps_P22-0009.pdf
Carson Creek History.pdf Carson Creek History.pdf
P22-0009 Completeness Determination 03-14-23.pdf P22-0009 Completeness Determination 03-14-23.pdf
Incomplete Letter 12-14-22.pdf Incomplete Letter 12-14-22.pdf
11-15-2022 Application Packet_P22-0009.pdf

Application Packet

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Application Packet [18.70 MB]

Transportation Impact Study (TIS) Initial Determination

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Transportation Impact Study [2.93 MB]

Trip Generation Estimates

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Trip Generation Estimates [1.77 MB]

Air Quality Management District Air Quality Impact Analysis Waiver

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download AQMD Waiver [130.54 KB]

Initial Consultation Letter – TAC Meeting May 15, 2023

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Initial Consultation Letter [196.90 KB]

EDH APAC June 7, 2023 Comment Letter to TAC Meeting

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download EDH APAC Comment Letter [160.54 KB]

El Dorado County Planning Department Carson Creek R&D FAQ

Attachments