US 50 Latrobe Rd El Dorado Hills Blvd Interchange Improvement

Project Description:
On US Route 50 in El Dorado Hills, from PM 0.7 to PM 1.1. Construct improvements to the eastbound on- and offramps at the El Dorado Hills/ Latrobe Road Interchange. Improvements include reconstruction of the EB diagonal on-ramp, EB on-ramp auxiliary lane, and the EB loop off-ramp. Project Initiation Date: 2/11/2008

The El Dorado County Department of Transportation and California Department of Transportation (Caltrans) are in the planning and design process to construct the remaining ultimate improvements to the eastbound on- and off-ramps at the El Dorado Hills/ Latrobe Road Interchange. Improvements include reconstruction of the eastbound diagonal on-ramp, eastbound on-ramp auxiliary lane, and the eastbound loop off-ramp. The County cannot adequately address all issues without input from those who are directly affected on a daily basis. Therefore, the public is encouraged to remain engaged throughout the process.

You can also visit the DOT Capital Improvement Program page for the Capital Improvement Program Book for additional information regarding this project.

Approved Project Study Report – Project Report(PDF, 19MB)

Public Meeting Presentation on December 13, 2023(PDF, 864KB)

Public Meeting Presentation on March 12, 2025(PDF, 1MB)

Draft Environmental Impact Report – Volume 1(PDF, 13MB)

Draft Environmental Impact Report – Volume 2(PDF, 19MB)

Final Environmental Impact Report (EIR) – April 2000(PDF, 20MB)

EIR Addendum #1 – March 16, 2005(PDF, 1MB)

EIR Addendum #2 – August 5, 2008(PDF, 3MB)

EIR Addendum #3 – February 26, 2012(PDF, 227KB)

Addendum No. 4 to the Final Environmental Impact Report(PDF, 2MB)