Skip to content Skip to main navigation Skip to footer

El Dorado County Board of Supervisors May 4, 2021 Meeting Minutes

Meeting in Video Recording format

Of note to El Dorado Hills residents:

21-0350AGENDA #21 sign Second Amendment to Road Improvement Agreement for North Silver Dove Way, Offsite Improvements Agreement 18-54823 with Lennar Winncrest, LLC, extending the performance period to May 22, 2022
AGENDA ITEMDepartment of Transportation recommending the Board approve and authorize the Chair to sign Second Amendment to Road Improvement Agreement for North Silver Dove Way, Offsite Improvements Agreement 18-54823 with Lennar Winncrest, LLC, extending the performance period to May 22, 2022. FUNDING: Developer Funded.

This matter was Approved on the Consent Calendar.
21-0550AGENDA #22 Department of Transportation recommending the Board consider the following pertaining to the 2021 Various West Slope Pavement Rehabilitation Projects, Contract 5513: 1) Approve and adopt the Contract Documents; and 2) Authorize advertisement for bids
AGENDA ITEMDepartment of Transportation recommending the Board consider the following pertaining to the 2021 Various West Slope Pavement Rehabilitation Projects, Contract 5513: 1) Approve and adopt the Contract Documents; and 2) Authorize advertisement for bids. FUNDING: Road Repair and Rehabilitation Act 2017 (SB1-RMRA) (100%) (No Federal Funds).

This matter was Approved on the Consent Calendar.
21-0666AGENDA #28 recommending the Board authorize the Chair to sign a letter of support for California Assembly Bill 843, which aims to allow Community Choice Aggregators access to existing state funding for renewable bioenergy electricity projects including biomass and biogas
AGENDA ITEMEnvironmental Management Department recommending the Board authorize the Chair to sign a letter of support for California Assembly Bill 843, which aims to allow Community Choice Aggregators access to existing state funding for renewable bioenergy electricity projects including biomass and biogas. FUNDING: N/A

This matter was Approved on the Consent Calendar.
21-0695AGENDA #29 approval of the Final Map (TM-F20-0007) for Serrano Village J7, creating a total of 65 residential lots, five private street lots, and six miscellaneous lots, on property identified by Assessor’s Parcel Number’s 123-040-010 and 123-040-011 located on the south side of Bass Lake Road, approximately 250-feet south of the intersection with Bridlewood Canyon Drive within the Serrano Master Planned Community, in the El Dorado Hills area
AGENDA ITEMPlanning and Building Department, Planning Division, submitting for approval of the Final Map (TM-F20-0007) for Serrano Village J7, creating a total of 65 residential lots, five private street lots, and six miscellaneous lots, on property identified by Assessor’s Parcel Number’s 123-040-010 and 123-040-011 located on the south side of Bass Lake Road, approximately 250-feet south of the intersection with Bridlewood Canyon Drive within the Serrano Master Planned Community, in the El Dorado Hills area, and staff recommending the Board take the following actions: 1) Approve Final Map TM-F20-0007 for Serrano Village J7 (Exhibit D); 2) Approve and authorize the Chair to sign the Agreement to Make Subdivision Improvements (Attachment B); 3) Approve and authorize the Chair to sign the Deferred Frontage Improvement Agreement (Attachment E); and 4) Approve and authorize the Chair to sign the Deferred Road Improvement Agreement (Attachment F). (Supervisorial District 1) Funding: Developer-Funded Subdivision Improvements.

This matter was Approved on the Consent Calendar.
21-0617AGENDA #30 approve and authorize the Chair to sign Amendment 1 to Agreement 3506 with Goodwin Consulting Group, Inc., for the provision of services for peer reviews of Fiscal Impact Analysis (FIA) and Public Facilities Financing Plans (PFFP) for various development projects, extending the term of the Agreement by three (3) years with a revised expiration of March 6, 2025, increasing the compensation by $335,000 for a total not-to-exceed amount of $400,000
AGENDA ITEMPlanning and Building Department, Planning Division, Current Planning Unit, recommending the Board approve and authorize the Chair to sign Amendment 1 to Agreement 3506 with Goodwin Consulting Group, Inc., for the provision of services for peer reviews of Fiscal Impact Analysis (FIA) and Public Facilities Financing Plans (PFFP) for various development projects, extending the term of the Agreement by three (3) years with a revised expiration of March 6, 2025, increasing the compensation by $335,000 for a total not-to-exceed amount of $400,000, updating Exhibit B to reflect 2021 rates, and other minor administrative changes as needed. FUNDING: Non-General Fund / Developer Funded.

This matter was Approved on the Consent Calendar.
21-0369AGENDA #34 Department of Transportation recommending the Board adopt and authorize the Chair to sign Resolution 027-2021 to designate three Green Zones as a part of the Sacramento Area Council of Governments (SACOG) Green Means Go pilot program.
AGENDA ITEMDepartment of Transportation recommending the Board adopt and authorize the Chair to sign Resolution 027-2021 to designate three Green Zones as a part of the Sacramento Area Council of Governments (SACOG) Green Means Go pilot program. (Cont. 4/13/2021, Item 20) FUNDING: N/A Staff requesting this matter be Continued off calendar.

This matter was Continued off Calendar upon Approval of the Consent Calendar.
21-0565AGENDA #41 a request for a voluntary pre-application conceptual review pursuant to Board Policy J6 for Bass Lake Regional Park (PA20-0006). The property is located between Bass Lake Road and Serrano Parkway, approximately 1.5 miles due north of U.S. Highway 50
AGENDA ITEMPlanning and Building Department, Planning Division, submitting a request for a voluntary pre-application conceptual review pursuant to Board Policy J6 for Bass Lake Regional Park (PA20-0006). The property is located between Bass Lake Road and Serrano Parkway, approximately 1.5 miles due north of U.S. Highway 50. APNs: 123-400-001, 115-400-025, 115-400-026, 115-400-021, and 115-400-002. Staff recommends that the Board take the following actions: 1) Evaluate the submitted Conceptual Review under Pre-Application PA20-0006 for the Bass Lake Regional Park; and 2) Provide the Applicant with initial feedback on the proposed project. (Supervisorial District 1) FUNDING: Applicant funded.

Public Comment: J. Gainsbourgh, K. Payne

No Formal Action.
Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Minutes [156.99 KB]

Attachments