25-0137 | 1 | 17. | Agenda Item | Department of Transportation recommending the Board authorize changes outlined in Items 1 through 6 listed below to the proposed 2025 Capital Improvement Program (CIP), with a return to the Board in June 2025 for adoption of the 2025 CIP: West Slope Road and Bridge Program: 1) Approve additions and changes to the West Slope Road/Bridge CIP projects for inclusion in the 2025 CIP as described in Attachment A; 2) Remove Latrobe Road – Investment Blvd. to Golden Foothill Parkway/Clubview Drive, CIP 36105055, from the unfunded list and add to the 2025 CIP; 3) Remove Missouri Flat Rd – China Garden to SR 49, CIP 36105027, from the 2025 CIP and add it to the unfunded list; and 4) Approve the schedule change to White Rock Road Widening (2 to 4 lanes) – Post Street to South of Silva Valley Parkway, CIP 36105042, to allow planning, environmental, and design work to begin in Fiscal Year 2024-25 instead of waiting until Fiscal Year 2025-26 as shown in the 2024 CIP. Tahoe Environmental Improvement Program (EIP): 5) Approve changes to the Five-Year Tahoe EIP as described in Attachment A.; and Capital Overlay and Rehabilitation Program (CORP): 6) Remove the CORP list from the 2025 CIP since these projects will be implemented with Senate Bill (SB) 1 funding. FUNDING: Federal, State, and Local Sources. Local funding sources may include any combination of the following: Traffic Impact Fee Program, Missouri Flat Area Master Circulation and Financing Plan, Road Fund, Tribe Fund, Accumulative Capital Outlay, Developer Advanced Funds, Sacramento Municipal Utility District Funds, and/or General Fund.
Public Comment: L. Campbell, L. Cauchon
A motion was made by Supervisor Parlin, seconded by Supervisor Veerkamp to: Authorize changes outlined in Items 1 through 6 listed below to the proposed 2025 Capital Improvement Program (CIP), with a return to the Board in June 2025 for adoption of the 2025 CIP: West Slope Road and Bridge Program: 1) Approve additions and changes to the West Slope Road/Bridge CIP projects for inclusion in the 2025 CIP as described in Attachment A; 2) Remove Latrobe Road – Investment Blvd. to Golden Foothill Parkway/Clubview Drive, CIP 36105055, from the unfunded list and add to the 2025 CIP; 3) Remove Missouri Flat Rd – China Garden to SR 49, CIP 36105027, from the 2025 CIP and add it to the unfunded list; and 4) Approve the schedule change to White Rock Road Widening (2 to 4 lanes) – Post Street to South of Silva Valley Parkway, CIP 36105042, to allow planning, environmental, and design work to begin in Fiscal Year 2024-25 instead of waiting until Fiscal Year 2025-26 as shown in the 2024 CIP. Tahoe Environmental Improvement Program (EIP): 5) Approve changes to the Five-Year Tahoe EIP as described in Attachment A.; and Capital Overlay and Rehabilitation Program (CORP): 6) Remove the CORP list from the 2025 CIP since these projects will be implemented with Senate Bill (SB) 1 funding.
Yes: 5 – Laine, Parlin, Turnboo, Ferrero and Veerkamp |