Bass Lake North
TENTATIVE SUBDIVISION MAP TO CREATE 90 LOTS RANGING IN SIZE FROM 7,204 SQUARE FEET TO 25,186 SQUARE FEET.AVERAGE LOT SIZE IS 10,808 SQUARE FEETPROJECT INCLUDES 6 OPEN SPACE LOTS AND 1 ROADWAY LOT. THE PROPOSED PROJECT IS LOCATED ON THREE VACANT PARCELS IDENTIFIED BY APN #S 115-400-06, 07, & 08.THE PARCELS ARE LOCATED OFF OF SIENNA RIDGE ROAD IN THE BASS LAKE HILLS SPECIFIC PLAN AREA. THE PROJECT WOULD REQUIRE A REZONE FROM A TO R1-PD
EAST SIDE OF BASS LAKE ROAD 1.2 MILES NORTH OF THE INTERSECTION WITH US HIGHWAY 50 IN THE EL DORADO HILLS AREA
HEARING – To consider the recommendation of the Planning Commission on the Bass Lake North Project (Rezone Z14-0008/Planned Development PD14-0010/Tentative Subdivision Map TM14-1522) on property identified by Assessor’s Parcel Numbers 115-400-06, 115-400-07, and 115-400-008, consisting of 38.57 acres, in the El Dorado Hills area, submitted by Norm Brown/NC Brown Development, Inc.; and staff recommending the Board take the following actions: 1) Adopt the September 2016 Addendum to the 1992 Bass Lake Road Study Area Final Program Environmental Impact Report (State Clearing House 1990020375) (Attachment E – Exhibit H), subject to California Environmental Quality Act Findings (Attachment 2B); 2) Adopt the Mitigation Monitoring and Reporting Plan (Attachment E – Exhibit H, Attachment 1) in accordance with the California Environmental Quality Act Guidelines Section 15097, incorporating the Mitigation Measures as presented; 3) Approve Z14-0008 rezoning Assessor’s Parcel Numbers 115-400-06, 1… |
Description: | TM14-1522: Bass Lake North |
Type: | SUBDIVISION-REVISION |
Subtype: | |
Planner: | TIFFANY SCHMID |
Status: | SUBMITTED |
Applied: | 8/16/2019 |
Approved: | |
Closed: | |
Expired: | |
Complete: | 8/16/2019 |
Incomplete: | |
Linked Activities: Parent Project20187 SUBDIVISION MAP APPROVED |
Attachments:08/19/2019 Application Packet_TM-R19-0002.pdf |
Loading...
Loading...
EDH APAC Public Comment Letter – Nov 12, 2020 Planning Commission Hearing
Loading...
Notice of Public Hearing December 18, 2020
Board of Supervisors – Appeal of Planning Commission Denial of Change to Condition of Approval #66
Loading...
EDH APAC Letter To BOS Supporting Planning Commission Denial
Loading...
Loading...