Skip to content Skip to main navigation Skip to footer

EDC Board of Supervisors February 11, 2020 Meeting Minutes

Meeting in Video Recording Format

Of note to El Dorado Hills residents:

20-018613Agenda ItemPlanning and Building Department, Planning Division, submitting for approval of a Final Map (TM-F19-0005) for the Saratoga Estates Tentative Subdivision Map Village 1A (TM14-1520), creating a total of 80 residential lots, 1 future development lot, and 5 lettered lots, ranging in size from 0.06 acres to 7.75 acres on the 25.426-acre site, on property identified as Assessor’s Parcel Number 120-070-020, located on the north side of Saratoga Way, approximately 1,100 feet west of the intersection with Finders Way, in the El Dorado Hills area, and recommending the Board consider the following: 1) Approve the Final Map (TM-F19-0005) for Saratoga Estates Village 1A; and 2) Approve and authorize the Chair to sign the Agreement to Make Subdivision Improvements (Attachment B). (Supervisorial District 1) FUNDING: N/A (Developer Funded)

This matter was Approved on the Consent Calendar.
20-016514Agenda ItemPlanning and Building Department, Planning Division, submitting for approval of a Large Lot Final Map (TM-F19-0006) for the Saratoga Estates Tentative Subdivision Map (TM14-1520) creating a total of 18 large lots for the purpose of financing and phasing, consisting of three future residential development lots and 15 lettered lots on the 121.87-acre property. The property, identified as Assessor’s Parcel Number 120-070-020, located on the north side of Saratoga Way, approximately 1,100 feet west of the intersection with Finders Way, in the El Dorado Hills area, and recommending the Board approve Large Lot Final Map (TM-F19-0006) for the Saratoga Estates Tentative Subdivision Map (Supervisorial District 1) (Exhibits A and B). FUNDING: N/A (Developer Funded Subdivision Improvements)

This matter was Approved on the Consent Calendar.
20-016215Agenda Itemrecorded in Book H of Subdivisions at Page 98, identified as Assessor’s Parcel Number 123-060-024, within the community of El Dorado Hills, Supervisorial District 1. FUNDING: Application Fees (General Fund).

Resolution 019-2020 was Adopted upon Approval of the Consent Calendar.
20-012623Agenda ItemDepartment of Transportation recommending the Board discuss the Grant Funding and Local Serving Share of Non-Residential Employment component of the 2020 Major Update to the Traffic Impact Mitigation Fee Program and provide staff and their consultants with input and direction. (Est. Time: 1 Hr.) FUNDING: Traffic Impact Mitigation Fee Program.

Public Comment: K. Payne, T. Kayes, G. Carpenter, B. Schetick, K. Bone

The Board discussed the Grant Funding and Local Serving Share of
Non-Residential Employment component of the 2020 Major Update to the Traffic
Impact Mitigation (TIM) Fee Program.
A motion was made by Supervisor Frentzen, seconded by Supervisor Hidahl to
direct staff and their consultants to:
1) Set 10% as the level of Grant Funding for the non-residential offset that staff
should assume in the TIM Fee Update;
2) Provide the Board an analysis of both the current percentage (62%) and the
previous percent (65%) as the basis for shifting non-residential equivalent
dwelling units to residential uses;
3) Direct staff to review the employment data in conjunction with each future
major update to the TIM Fee program;
4) Direct staff to analyze both the current methodology and the methodology to
only shift retail /commercial and office uses; and
5) Return to the Board with historical numbers for the different non-residential
categories of use for TIM Fees.


Yes: 5 – Veerkamp, Frentzen, Novasel, Hidahl and Parlin
19-171424Agenda ItemHEARING – To consider a request submitted by Joe Harn appealing the Planning Commission’s October 24, 2019 approval of Planned Development PD18-0005/Tentative Subdivision Map TM18-1536/Serrano Village J7 to allow a Development Plan for the proposed subdivision; a Tentative Subdivision Map creating 65 single family residential lots and six landscape lots; and Design Waivers of the El Dorado County Design and Improvement Standard Manual road improvement standards on property identified by Assessor’s Parcel Number 123-040-011, consisting of 9.86 acres, in the El Dorado Hills area; and staff recommending the Board take the following actions: 1) Find that the project is Statutorily Exempt pursuant to Section 15182 of the California Environmental Quality Act Guidelines; and 2) Deny the appeal, thereby upholding the Planning Commission’s October 24, 2019, approval of Planned Development PD18-0005/Tentative Subdivision Map TM18-1536 based on the Findings (Attachment B) and subject to the Conditions of Approval (Attachment C). (Supervisorial District 1) (Est. Time: 1 Hr.) 

Public Comment: D. Simon, K. Payne, T. Kayes

Supervisor Veerkamp re-opened the public hearing from February 4, 2020 and
after public and staff input closed the hearing.
A motion was made by Supervisor Hidahl, seconded by Supervisor Novasel to
Deny the Appeal thereby upholding the Planning Commission’s October 24, 2019
approval with the following additional conditions:
1) Include the Proposed Conditions in Mr. Pabalinas Memo dated February 10,
2020 (Attachment M) with a change to item 1 – Traffic – New Transportation
Department Condition of Approval to “Within three years from the payment of
$200,000 in full, the County will reimburse the entire $200,000 to the applicant”;
and
2) Item 50 – Prior to approval of the first final map for the Project, Developer
shall enter into an agreement in a form and content acceptable to the County
providing for dedication of the 12.5 acre Village J, Lot H park site to the
EDHCSD and assignment to the EDHCSD of rights to CFD funds, up to the
remaining amount available for park construction pursuant to the Public
Improvement Financing Plan, for use by the EDHCSD toward construction of the
12.5 acre Village J, Lot H park. If prior to approval of the first final map for the
Project, the County and the Developer are unable to reach agreement on the
amount of CFD funds available for park construction despite utilizing good faith
efforts, then as an alternative to the foregoing and prior to approval of the first
final map for the Project, Developer shall enter into an agreement in a form and
content acceptable to the County requiring Developer to commence
construction of the 12.5 acre Village J, Lot H District Park described in the
Development Agreement, Specific Plan, and Public Improvement Financing
Plan, weather permitting, within ninety (90) days of receiving approval from
both the County and EDHCSD of Construction Plans, Specifications, and
Contract documents, together with a Cost Sharing Agreement in form and
content acceptable to County, EDHCSD, and Developer addressing any
improvements included beyond a typical District Park, as defined by the El
Dorado Hills Specific Plan.

This proposed Condition of Approval would replace current Condition of
Approval No. 50.


Yes: 5 – Veerkamp, Frentzen, Novasel, Hidahl and Parlin
Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download Minutes [139.08 KB]

Attachments